ZoomDetails Tregalana Stage 1 – 2.2 MWBy Meralli SolarJune 13, 2022Leave a comment Completed: 2021Purpose: First stage of a generator feeding into the gridFootprint: 1.54 HectaresStructure: Jurchen TechnologyModules: Ginko Solar PanelsLocation: Whyalla, South Australia
ZoomDetails Tamburlaine – 99.5KWBy Meralli SolarJune 13, 2022Leave a commentPurpose: Offsetting winery processing power Structure: Jurchen Technology Modules: JA Solar Location: Cudal, New South Wales
ZoomDetails Sunnyside – 99kWCompleted Solar ProjectsBy Meralli SolarMarch 31, 2021Leave a commentBuilt on the banks of the Murray River, the Sunnyside build was completed in 5 days.