Tregalana Stage 1 – 2.2 MW
Completed: 2021Purpose: First stage of a generator feeding into the gridFootprint: 1.54 HectaresStructure: Jurchen TechnologyModules: Ginko Solar PanelsLocation: Whyalla, South Australia
Completed: 2021Purpose: First stage of a generator feeding into the gridFootprint: 1.54 HectaresStructure: Jurchen TechnologyModules: Ginko Solar PanelsLocation: Whyalla, South Australia
Purpose: Offsetting winery processing power Structure: Jurchen Technology Modules: JA Solar Location: Cudal, New South Wales
Built on the banks of the Murray River, the Sunnyside build was completed in 5 days.