
Meadowbank – 65 kW
Purpose: Small-scale on farm pump solution Structure: Jurchen TechnologyModules: JA SolarLocation: Glenora, Tasmania
Purpose: Small-scale on farm pump solution Structure: Jurchen TechnologyModules: JA SolarLocation: Glenora, Tasmania
Built on the banks of the Murray River, the Sunnyside build was completed in 5 days.
Completed: 2019 Purpose: Generator Footprint: 5.8 ha Structure: Jurchen Technology Modules: JA Solar Location: Baroota, South Australia CO2 Offset: Annual CO2 offset is expected to be 12,184 tonnes Generation Capacity: Capable of powering 2,267 homes on average