Skip to content
Meralli Projects
Revolutionising the Australian Solar Industry
Meralli Projects
  • Home
  • Our Solar Projects
    • Latitude Solar Farm (Currently Underway) – 9 MW
    • Tregalana Stage 1 – 2.2 MW
    • Tamburlaine – 99.5KW
    • Meadowbank – 65 kW
    • Sunnyside – 99kW
    • Baroota – 8.9 MW
    • Kanowna- 9.18 MW
    • Dareton – 3.8 MW DC Commercial
    • Dunblane – 11MW DC Commercial
    • Chillamurra – 4.6 MW DC Commercial
  • Agribusiness
  • Storage Solutions
  • About Us
  • Testimonials
  • News
    • Achievements
  • Job Opportunities
  • Connect With Us
Search:
Meralli ProjectsMeralli Projects
  • Home
  • Our Solar Projects
    • Latitude Solar Farm (Currently Underway) – 9 MW
    • Tregalana Stage 1 – 2.2 MW
    • Tamburlaine – 99.5KW
    • Meadowbank – 65 kW
    • Sunnyside – 99kW
    • Baroota – 8.9 MW
    • Kanowna- 9.18 MW
    • Dareton – 3.8 MW DC Commercial
    • Dunblane – 11MW DC Commercial
    • Chillamurra – 4.6 MW DC Commercial
  • Agribusiness
  • Storage Solutions
  • About Us
  • Testimonials
  • News
    • Achievements
  • Job Opportunities
  • Connect With Us

Blog

You are here:
  1. Home

What do you think? Researching attitudes to large scale solar farms.

UncategorizedBy Meralli SolarJuly 12, 2021Leave a comment

We’re helping UNE researcher Heidi Naylor get to the bottom of why people support or oppose large scale solar farms in Australia and we need your help. So grab a cup of coffee and jump onto https://loom.ly/mHpz1_w and tell us what you think. The survey takes about 15 minutes and the outcomes will be published and of…

Details

‘Renewables sector key to regional renewal’: Peter Mailler.

UncategorizedBy administratorMay 3, 2021Leave a comment

“… we need to change the way we think about renewable energy opportunities.  For too long, people have been duped into thinking the only opportunities in renewables lay in rooftop solar or wholesale electricity supply into the national grid.” Peter Mailler. Peter Mailler (brother of Meralli Director David) puts fingers to the keyboard and outlines…

Details

Does flooding impact a solar generator? Not with PEG & Meralli know-how.

NewsBy Meralli SolarMay 3, 2021Leave a comment

The Kanowna Solar Farm, built by Meralli in 2019 (here’s the background to the build), is located 95km west of Moree. The recent floods had a big impact on the area and we were delighted to see that the facility didn’t skip a beat, despite the impact of flooding. With 187mm of rain falling in…

Details
1
234567891011121314151617181920212223242526272829303132333435363738
…3940414243…
4445
46
Recent Posts
  • Australia’s record surge in utility-scale battery energy storage, Tighter foreign investment rules + Aiming for ‘net-negative’ emissions – Meralli’s weekly wrap on all things renewables
  • Faster approval for VIC renewable projects, NER rule changes + New England transmission route revised – Meralli’s weekly wrap on all things renewables
  • Predicting the future of solar, Future-proofing Australia’s electricity network + SA fast-tracks 100% renewables target to 2027 – Meralli’s weekly wrap on all things renewables
  • VIC Blackout leaves 500,000 homes without power, Report identifies bottlenecks preventing renewables uptake in WA + Can solar panels act as bushfire warning? – Meralli’s weekly wrap on all things renewables
  • National Energy Rules Update to Include Emissions Reduction, Average Wholesale Energy Prices Drop + $1.3M Funding Announced for VIC Women in Energy Program – Meralli’s weekly wrap on all things renewables
Meralli Projects
Go to Top